

The application will include information that shows how the design will:

RIBA Plan of Work Before building work startsīefore starting any building work, applicants will need to submit a design application to BSR. Designīuilding safety risks will need to be considered from the initial design phase so that buildings are: BSR will assess whether dutyholders are considering both:īSR will have a range of new enforcement powers throughout the design and construction of a development.

Applicants will no longer be able to choose their building control body. The Building Safety Regulator (BSR) will become the building control authority for high-rise buildings. The building safety reforms introduce decision points during the building's design, construction and completion.
